Tianjin Olympic Centre benefits from a new hybrid grass pitch

THE CLIENT - TIANJIN OLYMPIC CENTRE

Tianjin Olympic Centre, an iconic international sports venue in China known as “The Water Drop” for its distinctive architectural design, is a hub for elite sporting events and home to two Chinese Super League clubs.

THE BACKGROUND

The stadium required a comprehensive pitch upgrade to meet the demands of frequent high-intensity usage and provide a world-class playing surface. After extensive research and evaluation, the management team selected SIS Pitches to deliver a cutting-edge solution that would set new pitch performance and durability standards.

THE BRIEF

The project encompassed:

  • Replacing the existing pitch foundation with advanced systems for superior performance.
  • Integrating SIS Grass Hybrid turf, known for its stability and longevity.
  • Installing SIS Air aeration technology for proactive soil management and undersoil heating for all-weather playability.
  • Delivering a surface capable of withstanding the demands of intensive competition and training schedules.
WHAT WE DID

Installation of SIS Grass Hybrid pitch

SIS Grass technology blends 95% natural grass with synthetic fibres, inserted at 2cm x 2cm spacings, creating a surface that maintains the feel of natural turf with the added resilience of artificial fibres. This ensures:

  • Greater pitch stability.
  • Increased playing hours without compromising quality.
  • Consistent performance under heavy use.
SIS AIR AERATION SYSTEM

The SIS Air system, first introduced at the Luzhniki Stadium during the 2018 FIFA World Cup, was implemented to:

  • Manage soil moisture content efficiently.
  • Remove excess water from the soil profile, preventing waterlogging.
  • Boost ventilation, promoting healthier, stronger grass.
COMPREHENSIVE FOUNDATION UPGRADE

The pitch foundation was rebuilt from the ground up, including:

  • New gravel and drainage systems.
  • A custom-designed irrigation system tailored to the stadium’s unique structure.
  • Lower and upper root zones optimized for grass growth.
  • An underground heating system divided into three zones for precise temperature control.
THE OUTCOME

The 7,800-square-meter hybrid pitch at Tianjin Olympic Centre now offers unmatched durability and performance, meeting the needs of international level competition.

During the construction process SIS Pitches have strictly controlled the works and materials quality resulting in a high quality final product, which meets our anticipated requirement. The irrigation system was designed around our unique stadium design. Our stadium is the shared home of two Chinese Super Clubs, with a high frequency of use. Under the test of intense competition and training activities, the pitch is still in perfect condition. We are very satisfied! Thank you for the hard work of SIS Pitches construction and maintenance teams!

SIS Pitches are honoured and proud to be given the opportunity to work on the Tianjin Olympic stadium in Tianjin, China installing the latest technology used at 6 of the 12 stadiums at the Russian World Cup 2018. The installation of the SIS Air ventilation system, the undersoil heating and the SIS Grass Hybrid grass systems will provide an outstanding world class playing surface meeting and exceeding the expectations of the both players and officials for the Tianjin stadium.

Carlos Reis, Director at SIS Pitches

Share:

Arrange a free consultation today

Take the first step to your perfect sports surface. Arrange a free consultation or site visit today.

Get in touch

Read more

Stockport County FC win big on SISGrass hybrid surfaces

Congratulations to Stockport County FC, recently crowned champions of EFL League Two after an excellent season in an extremely competitive league. This promotion follows their recent success in the National League during the 2021–2022 season, showcasing their ambitions to continue climbing the football pyramid.

Read more